|
| Picture | Title | Category | Assembly |
---|
|
I) Wiggler.. Align Tube-End-Cap with drill bit
|
I) Wiggler.. Align Tube-End-Cap with drill bit |
instrument assembly |
fiber wiggler
|
|
improved fluidics tray
|
improved fluidics tray |
Fluidics |
fluidics tray
|
|
improved pinch clamp
|
improved pinch clamp |
Fluidics |
fluidics tray
|
|
I) attach rail
|
I) attach rail |
instrument assembly |
Optical rail and objective sliding mount
|
|
Instrument head open
|
Instrument head open |
instrument assembly |
instrument Head
|
|
I) Complete detector assy on bracket
|
I) Complete detector assy on bracket |
instrument assembly |
force detector
|
|
I) ND filter taped over the relay lens.
Prism_Box_Frame version 2 will have room for ND filter and 75mm lens both inside hole. Lay filter directly on pbs cube. Then lay flat side of lens directly on filter. Then screw in retainer ring. |
I) ND filter taped over the relay lens. |
instrument assembly |
Prism Box
|
|
improved fluidics
see Document "How to Improve Fluidics" |
improved fluidics |
Fluidics |
Fluidics set
|
|
I) Place foam inside to keep the optical fibre in place
|
I) Place foam inside to keep the optical fibre in place |
instrument assembly |
Laser assembly
|
No more hits.
|